Preloader

2x pipe fitters 250 mm ductile iron pipe installation

  • Category Construction
  • Shift 7 O'clock start
  • Posted On Mar 2, 2021
  • No. of Openings 1 opening
  • Job Level General Operative
  • Job Start Date Jan 1, 1970

Job Description

2x pipe fitters 250 mm ductile iron pipe installation startsthe 8th of March 2, starts 4 weeks work  coleshill ratenegotiable